Project Description

S.R. 0080, Section B11

Next  Project

Previous Project

I-80 - Logantown Rock Cut - Mile 181 -Looking East

 

I-80 Mile 181 - Looking West

 

S.R. 0080, Section B11

Centre and Clinton Counties, PA

Construction inspection and documentation for the restoration, rehabilitation, and resurfacing of 15 miles of Interstate 80 including 12 bridges.

 

Client:  PENNDOT District 2-0

             Clearfield, PA

 

Project Cost:  $28M

 

Completion Date:  1995

More Project Aerial Photos

Project Location Map

 Project consisted of bituminous overlay of existing reinforced cement concrete pavement with bituminous concrete base course, bituminous binder course, ID-2, RPS, bituminous wearing course, ID-2, SRL-H, paved shoulders, Type 7, modified, concrete pavement patching, complete bridge superstructure replacement and substructure repairs involving partial abutment and pier replacement, building and removal of temporary ramps and median crossovers, maintaining and protecting traffic and traffic control devices, installing new signs, pavement marking, setting and removal of double face concrete barriers, guide rail, drainage, and pavement joints.  

 

 

  T. W. CONSULTANTS, INCORPORATED

Engineers and Planners
5500 Corporate Drive ·  Suite 300  ·  Pittsburgh, PA  ·  15237
Phone: (412) 369-7500  ·  Fax: (412) 369-7964 

Copyright © 2000 T.W. CONSULTANTS INCORPORATED

  All rights reserved.