S.R.
0322, Section B01
Mifflin
County, PA
Construction
inspection and documentation for a 3.37 mile four-lane separated highway.
Client: PENNDOT
District 2-0
Clearfield, PA
Project Cost: $30M
Completion Date: 1999
Project involved
plain cement concrete pavement; subbase; earth median; one single-span
structure with two bridge approach slabs; dual four-span structures with
two bridge approach slabs; one two-span overhead structure; the
installation of concrete pipe, retaining wall, sound barrier, traffic
signals, drainage, and guide rail.
|